Sign up to our newsletter
    • Home
    • Jobs
    • News
    • Events
    • Advertise with us
    • What we do
    • News
    • £22m tidal lagoon construction contract goes out to tender
     
    October 10, 2016

    £22m tidal lagoon construction contract goes out to tender

    News

    Water Briefing    ‘Tidal Lagoon Power Ltd has gone out to tender with a design and build contract to construct a turbine manufacture and pre-assembly plant in the Swansea region worth an estimated £22 million. The contract covers the design, construction and commissioning of a turbine manufacturing plant that will house the plant and equipment necessary for the turbine manufacturing contractor to undertake final assembly and machining of parts within the building for the Swansea Bay Tidal Lagoon Project. The building will also be used to house TLSB employees – the intention is that the building will become the regional office for Tidal Lagoon Power. Tidal Lagoon Swansea Bay (TLSB) will be the world’s first purpose built tidal energy lagoon – the generating station will have an installed capacity of 320 Mega Watts (MW) and will enclose part of Swansea Bay. In total the seawall will form an approximately 9.5km-long, U-shape which will encompass approximately 11.5km2. Click here to read more.

    Tagged: renewables, Swansea, Swansea Tidal Logoon, Tidal lagoons

    Ocean and Coastal Futures Ltd
    23 Hauxley Links
    Low Hauxley
    Morpeth
    Northumberland
    NE65 0JR

    • LinkedIn
    • X

    Telephone: 07759 134801

    Email: CMS@coastms.co.uk

    Subscribe to our newsletter

    Sign up now

    All content copyright © Ocean and Coastal Futures

    Data protection and privacy policy

    Data Protection and Privacy Policy
    Ocean and Coastal Futures, formerly known as Communications and Management for Sustainability

     


    Data Protection and Privacy Policy
    Ocean and Coastal Futures, formerly known as Communications and Management for Sustainability