JOHN SARGENT LECTURE
Tuesday 7th March 2023 at 18:00hrs

 

Institute of Civil Engineers, One Great George Street, London, SW1P 3AA
This event will also be streamed online

 

Dock Filling for the New Everton Stadium Project at Bramley Moore Dock, Liverpool

 

Presented by

Andy Baynton – Principal Engineer, Laing O’Rourke

 

 

Book now

 

Bramley Moore Dock was opened in 1848 and became a major part of the Port of Liverpool as the dock system was gradually extended to the north of the city. By the 1980’s, the area went into decline and remained as such until recently with only part of the surrounding land being used by a dredging company and the dock itself being used as a mooring for tugs operating out in the port.

In 2021, Everton Football Club gained planning permission to build a 52,888-seat capacity stadium on what would become land reclaimed by infilling of the dock.

This presentation aims to provide an overview of the operation including preparation works, filling, compacting and testing in order to allow follow on works to commence for construction of the new stadium.

Refreshments available from 17:30hrs, with Kendal’s Bar open post-event for networking opportunities.

 

Corporate Members of CEDA UK

No Comment

Comments are closed.